ebir
ES
Committee question

How is the system isolated from the internet and the public cloud?

The production server is installed on a segmented network with no internet egress, inside your perimeter. The model, the permissioned knowledge base and the audit log live there. It connects to your systems only to read, never to modify. The demonstration runs on a computer with no internet, so the committee sees it working before signing.

The detail

DEBIR’s remote access during the build goes through a jump server approved by security, with two-factor authentication and a recorded session. The deployment architecture is delivered in the Assessment.

Sources

  • DEBIR architecture document, messages for information security and gate 2 (hardware installed on an isolated network).

Regulatory framework verified against primary sources on November 1, 2026.

Next step

Discovery sessions, no commitment

With technology, compliance and two process owners. Includes an offline demonstration prepared for your sector, without using your company’s data.

1

Inventory and obligations

Data in four levels and a first review of what your sector requires.

2

Three candidate use cases

And the Assessment proposal. The Discovery is credited against the Assessment.

3

Founding clients program

Three seats, with an explicit discount in exchange for a publishable case and a reference.

Terms

Discovery and evidence pilot at no cost, Assessment at a discount, in exchange for a publishable case, a reference and feedback. Continuous operation is always paid at list price.